Main page Epoxy Flooring {{ sysName }}
{{ sysName }} {{ sysSpec }}
{{ heroPlaceholder }}

Illustrative renders. Photographs of completed projects will replace them.

{{ t.label }}
Swipe for more views
{{ sysEyebrow }}

Epoxy Flooring — {{ sysName }}

{{ sysIntro }}

  • {{ s.label }}: {{ s.value }}
Calculate your project
Quantities rounded up to complete packs
Project over 250 m²
Quantities below are shown for 250 m². For larger areas a manager checks the substrate, phasing and delivery and prepares a project quotation.
This product is being finalised
Exact pricing and material consumption for the epoxy range are still being confirmed. Quantities are not calculated yet — message us for a manual estimate.
What the system consists of

Three layers, specified by load

01

Primer

Two-component polyurethane on the ground and cleaned slab. Binds dust and seals the pores so the body coat does not pinhole.

02

Body coat

BASE: a rolled epoxy coating, 0.3–0.5 mm. PRO: self-levelling epoxy, 2–3 mm, broadcast with aggregate where slip resistance is needed.

03

PU topcoat

Polyurethane, matte or gloss. Protects the epoxy from UV yellowing and gives the surface that is actually walked and cleaned.

All epoxy components ›
Check the quantities

Send the calculation to a specialist

We confirm the system against the load, check the slab preparation, and quote delivery to your emirate.

✓ Quantities checked against the real project ✓ Substrate moisture and preparation advice ✓ Applicator introduction when required
Attached to your enquiry: {{ summaryLine }}
{{ leadError }}
Thank you — we received your enquiry and will get back to you shortly.
By submitting this form, you agree to our Privacy Policy.
FAQ

Before you order

Does the slab have to be ground?+

Yes. Mechanical preparation is what creates the bond. Laitance, old paint and curing compounds are removed, the slab is vacuumed and primed the same day.

BASE or PRO for a garage?+

BASE for a sound, level slab used by one or two cars. PRO where the slab is uneven, where hot tyres sit for long periods, or where the floor continues into a workshop.

How long before the floor can be used?+

Foot traffic after 24 hours in both systems. Vehicles and full chemical resistance after 3–5 days for PRO, 48 hours for BASE, at normal indoor temperature.