Images are visualisations of typical applications.
{{ sysIntro }}
Two-component, solvent-free epoxy primer on the ground and cleaned slab. It penetrates the concrete and stops outgassing, so the body coat does not pinhole.
BASE: a rolled epoxy coating, 0.3–0.5 mm. PRO: self-levelling epoxy, 2–3 mm, broadcast with aggregate where slip resistance is needed.
Polyurethane, matte or gloss. Protects the epoxy from UV yellowing and gives the surface that is actually walked and cleaned.
We confirm the system against the load, check the slab preparation, and quote delivery to your emirate.
Yes. Mechanical preparation is what creates the bond. Laitance, old paint and curing compounds are removed, the slab is vacuumed and primed the same day.
BASE for a sound, level slab used by one or two cars. PRO where the slab is uneven, where hot tyres sit for long periods, or where the floor continues into a workshop.
Foot traffic after 24 hours in both systems. Vehicles and full chemical resistance after 3–5 days for PRO, 48 hours for BASE, at normal indoor temperature.